Overview
Rapid Details
- Location of Origin:
-
Zhejiang, China
- Model Name:
-
EPT
- Design Quantity:
-
XGQT1
- Technics:
-
Casting
- Relationship:
-
Male
- Shape:
-
Equivalent
- Solution title::
-
Rigid Couplings
- Entire body content:
-
Ductile Cast Iron
- Application:
-
Pipe Traces Connect
- Floor remedy::
-
Epoxy Coating
- Stress:
-
300PSI
- Color::
-
White Silver Crimson Blue
- Certificate::
-
UL/FM/BSI/CE/ISO9001
- Shipping and delivery Time::
-
seven-fifteen Days
- Dimension::
-
1/2"-12"
- Services::
-
OEMODM
Packaging & Shipping and delivery
- Offering Models:
- Single merchandise
- Single package deal dimension:
- 30X30X30 cm
- One gross excess weight:
- one.000 kg
- Image Illustration:
-
Lead Time
: -
Amount(Pieces) one – 10000 >10000 Est. Time(times) seven To be negotiated
On-line Customization
UL FM CCC Mechanical Grooved pipe coupling rigid joints
Specification
Solution title |
Rigid couplings |
Substance |
Ductile iron |
Technics |
Casting |
Dimensions(outer diamater) |
76mm/89mm/114mm/140mm/165mm/219mm/273mm/325mm or Tailored Measurement |
Pressure |
300psi |
Shade |
White / Crimson /  Blue as for each customers&apos requirement |
Link |
Grooved |
Packing |
ਅ-45 pcs per containers at most |
MOQ |
1pc |
Goods Approach
Top quality Inspection
Packing & Shipping and delivery
To far better make certain the basic safety of your merchandise, skilled, environmentally pleasant, handy and productive packaging providers will be offered.
Set up Recommendations
Certifications
Firm Profie
Our firm is a modern day company specialized in R & D, generation, sales and engineering service of grooved pipe fitting technique. The business has contemporary R & D center of procedure mould, computerized spraying workshop and automatic packaging workshop.
Enables users to get the very best products and solutions with bare minimum capital investment decision
FAQ
Q: Are you a manufacturing unit or a trade company?
A: We are a manufacturing unit.
Q:The place is your manufacturing unit?
A:Our manufacturing facility situated in Weifang metropolis,Shandong Province,China.Warmly welcome to check out our manufacturing facility!
Q.What&aposs your payment conditions?
A: Payment expression is 30% TT as deposit,70% stability should be compensated ahead of delivery.
Q.Your supply time is?
A:ten-fifteen functioning days after deposit.
Q: Guarantee?
A: Count on the quatity.